Healthcare

Higher Education

K-12 Education

Technology / Research

Central Utility Plant

LEED® /
Sustainable Design

 

 



About Us        Our Work        Client Solutions        Our Team        News         Contact Us        Home


 

 

Synthes
Clean Room
Monument, Colorado

Date: 2006
Cost: $650,000
Area: 1,970 GSF

Project consisted of an Class 10,000 (ISO 7) clean room and adjacent Class 100,000 (ISO 8) clean room. A Class 100,000 (ISO 8) gowning room was built inside of the biomedical manufacturer’s facility. The design provided for an outdoor custom packaged HVAC unit with DX cooling, electric reheat, outdoor air intake and two-stage pre-filtration to provide the required airflow. Each room was designed to incorporate dynamic room pressure control to insure the correct pressure relationship is maintained. Low wall returns were used throughout for improved airflow patterns and maintaining the cleanliness of the space.

Other services included an overhead ceiling electrical power raceway grid system for flexibility and clean dry compressed air (CDA) connections for equipment hook-up, and an electric steam generator using RO water from the building RO system provides the humidification. SBEC provided airflow modeling animations to the client so they could identify where they wanted the airflow to be placed within the space and minimize dead zones or “dirty” areas.