Parkview Medical Center
New Boiler Plant
Pueblo, Colorado

Date: 2002
Cost: $2,000,000
Area: 1,750 GSF

For this new boiler plant, SBEC designed the power distribution and grounding for the new boilers and boiler building. The project consisted of the upgrade of existing emergency generator building transfer switch and distribution panel to feed new building, the design of infrastructure for future expansion, power distribution for new pumps and mechanical equipment in the new building, design of indoor/outdoor lighting systems and lighting controls, design of new fire alarm system and control panel and the design of pathways for temperature control cabling. SBEC coordinated electrical contractor’s scope with manufacturer’s equipment drawings.